Caisson Outfall Unit 1 – UCC Tangguh

PETROSEA – British Petroleum

Project Information

Project :
Caisson Outfall Unit 1 – UCC Tangguh

Client :
PETROSEA – British Petroleum

Scope of Work :
Welding & Painting External 12 Inch Pipe

Material

  • Pipe ASTM A53 Gr. B 12” sch. 40
  • Pipe ASTM A53 Gr. B 10” sch. 40
  • Slip on Flange ASTM A105 12” #300
  • Elbow ASTM A53 Gr. B 10” sch. 40
  • Steel plate ASTM A36 16mm thickness

Fabrication

  • WELDING
  • Procedure WPS ASME IX
  • Welding process SMAW
  • Welding inspector CSWIP 3.1
  • Welder Migas Certified

Coating

  • Reference: Coating Procedure Test / Painting Pre-Qualification Test
  • Apply on internal & external pipe surface ISO 8501-1 Sa 2,5
  • Painting material JOTUN Tank guard Storage (DFT total 400 microns)
  • Blaster & Painter Level II certified by LSP Ahli Korosi Nasional
  • Coating Inspector NACE Level II certified