Project Information
Project :
Warman Discharge Pump House Unit – Awakmas Gold Mining
Client :
PETROSEA – INDIKA Energy
Scope of Work :
Fabrication, Welding & Rubber Lining
Material
- Warman Pump
- Pipe A53 Gr B
- Reducer A53 Gr B
- Slip On Flange A105
- Rubber Lining Material
Fabrication
- Rubber Lining
- SMAW Welding
- WPS ASME IX
- CSWIP 3.1 Inspector
- BNSP Inspector
Coating
- Reference: Approved Coating & Rubber Lining Procedure ASTM
- Apply on external (painting) & internal (rubber lining) pipe surface
- External painting material: International Interseal 670HS High Build Epoxy
- Internal rubber lining material: Linatex Premium Red with 12mm thickness
- Welding Inspector CSWIP 3.1 certified
- Coating Inspector Level II BNSP
- Blaster & Painter Level II certified by BNSP