Warman Discharge Pump House Unit – Awakmas Gold Mining

PETROSEA – INDIKA Energy

Project Information

Project :
Warman Discharge Pump House Unit – Awakmas Gold Mining

Client :
PETROSEA – INDIKA Energy

Scope of Work :
Fabrication, Welding & Rubber Lining

Material

  • Warman Pump
  • Pipe A53 Gr B
  • Reducer A53 Gr B
  • Slip On Flange A105
  • Rubber Lining Material

Fabrication

  • Rubber Lining
  • SMAW Welding
  • WPS ASME IX
  • CSWIP 3.1 Inspector
  • BNSP Inspector

Coating

  • Reference: Approved Coating & Rubber Lining Procedure ASTM
  • Apply on external (painting) & internal (rubber lining) pipe surface
  • External painting material: International Interseal 670HS High Build Epoxy
  • Internal rubber lining material: Linatex Premium Red with 12mm thickness
  • Welding Inspector CSWIP 3.1 certified
  • Coating Inspector Level II BNSP
  • Blaster & Painter Level II certified by BNSP